Ca Mau power plant, Vietnam

Using a combination of two Menard techniques

Menard consolidated a 240,000 m² platform on which the Ca Mau power plant (two 750 MW units) was built, 360 km south of Hô Chi Minh-City, by the Cai Tau river near the Khanh village. Using a combination of two Menard techniques, the Menard Vacuum™ system and vertical drains, 465,000 m³ of water were extracted from the compressible clays with the help of 27 pumps, leading to 3 m to 4 m of settlement in some areas.