PROJECTS

Cement bentonite cut-off wall for a nickel mine, Canada

2022-11-28T17:38:57+01:00

Cement bentonite cut-off wall for a nickel mine, Canada The cut-off wall was one part of the remediation project of the Vale mine in Thompson. To prevent the tailings from producing acid while reacting with the air, water has to cover them. As a result, the tailings dam needed to be raised and [...]

Annacis Island wastewater treatment plant, Canada

2022-11-28T17:07:06+01:00

Annacis Island wastewater treatment plant, Canada  In June 2016, following 21 months of work, Menard, working in a joint venture with JJM Construction, completed the reinforcement of about 1.5 million cu. metres of soil as part of the extension of a wastewater treatment plant.  In a demonstration of its agility, Menard's Canadian subsidiary [...]

Souffelweyersheim, France

2023-08-09T11:59:53+02:00

Souffelweyersheim, France  Close to  Strasbourg, Menard has completed 530 inclusions for the construction of an industrial building.  At Souffelweyersheim, in the north-east of France, Menard has constructed Controlled Modulus Columns (CMC) for the construction of an industrial building.  The site is made up of backfill at the surface level, with low-density loess at the medium [...]

Go to Top