Ca Mau power plant, Vietnam 

Menard consolidated a 240,000 m² platform on which the Ca Mau power plant (two 750 MW units) was built, 360 km south of Chi Minh-City, by the Cai Tau river near the Khanh village. Using a combination of two Menard techniques, the Menard Vacuum system and vertical drains, 465,000 m3 of water were extracted from the compressible clays with the help of 27 pumps, leading to 3 m to 4 m of settlement in some areas. 

The Menard group develops foundation solutions based on ground improvement and reinforcement technologies. Its treatments eliminate the need for the deep foundations traditionally used to support surface structures.